Saint Gobain – Celotex Plant – Ipswich

We were assigned to create the following:

  • New staff entrance with full ground survey/paths and turnstiles
  • Removal of existing fire doors and re-positioning with new visitors car park and walkway;
  • Removal of existing chemical plant rooms and redevelopment

The scope of works involved in producing the required projects listed were as follows:

  • Full asbestos survey
  • Full geographical and services survey with CAD drawings as evidence
  • Groundwork and Civils completed to trafficked areas with full traffic management
  • New staff key coded turnstiles and automation;
  • New visitors car park with full demarcation and traffic signage
  • Replacement cladding system to existing warehouse and plant
  • New zinc roof to new chemical plant room
  • Scaffolding with fully integrated alarm system
  • New floor surfacing
  • Fully insulated timber roof
  • Full RAMS and H&S control throughout project